We provide comprehensive services to help healthcare facilities achieve operational excellence and compliance. Our Facility Commissioning solutions ensure optimized systems, validated performance, and adherence to safety requirements. We specialize in Accreditation Preparation with tailored documentation, staff training, and mock surveys to streamline the process. Additionally, our Life Safety Reviews assess facility drawings and buildings for compliance, risk mitigation, and safety standards—enhancing overall readiness and efficiency.
Compass CG Achieves AABC Commissioning Group Corporate Membership

Compass CG, LLC is proud to announce our official approval as a Corporate Member of the AABC Commissioning Group (ACG).

This recognition connects Compass CG with the largest network of certified independent third-party commissioning professionals—organizations dedicated to ensuring buildings perform reliably, safely, and efficiently from the start.

Commissioning is a vital part of today’s building process. Modern facilities are highly complex environments where numerous systems must operate together seamlessly. At Compass CG, this includes the commissioning of facility exterior closure, fire suppression systems, plumbing systems, HVAC systems, electrical systems, communications systems, electronic safety and security systems, and site utility systems. Each is critical on its own, but their true value is realized only when they function together to meet the client’s project requirements.

Without proper commissioning, even well-designed systems can fall short of expectations, leading to inefficiencies, higher costs, and risks to reliability. Independent commissioning provides assurance that these systems are verified, documented, and aligned with the owner’s goals and expectations.

By joining ACG, Compass CG strengthens its commitment to:

  • Independence and integrity — unbiased, third-party verification free from conflicts of interest.
  • Safety and reliability — ensuring systems critical to occupant well-being and facility operations perform as designed.
  • Efficiency and sustainability — supporting long-term energy savings and operational performance.
  • Client confidence — delivering facilities that meet expectations on day one and throughout their lifecycle. 

Whether for healthcare facilities, government buildings, or private-sector projects, this milestone reflects Compass CG’s dedication to commissioning services that protect investments, improve performance, and support the people who depend on these environments every day.

We’re proud to take this next step in our mission: delivering commissioning services that bring lasting value to every client we serve.

Life Safety & EC Standards Merging into New “Physical Environment” Chapter

In a significant move to modernize and simplify healthcare accreditation, The Joint Commission has announced the consolidation of its Life Safety (LS) and Environment of Care (EC) standards into a single, unified chapter titled “Physical Environment (PE).” These changes are set to take effect on January 1, 2026, giving organizations ample time to prepare for this transformation.

This update isn’t just cosmetic—it's a fundamental restructuring of how hospitals and critical access facilities approach accreditation. The number of Elements of Performance (EPs) has been reduced by nearly half, and the new structure is designed to align more directly with the Centers for Medicare & Medicaid Services’ (CMS) Conditions of Participation (CoPs).

What’s Changing?

As part of its effort to reduce administrative burden and improve clarity:

  • The PE chapter replaces the separate EC and LS chapters, reflecting a streamlined, outcome-driven approach to facility compliance.

  • All retained EPs in the PE chapter map directly to CMS CoPs, ensuring survey expectations are tightly aligned with regulatory requirements.

  • Legacy standards not required by CMS are being removed, helping facilities focus on what matters most to patient safety and performance.

Importantly, this overhaul does not introduce new concepts, but rather reorganizes and clarifies existing ones in a more usable format.

Supporting Tools to Navigate the Change

To support healthcare organizations in adapting to the new Physical Environment (PE) chapter, a series of reference tools have been released to clarify what’s changed, how it connects to CMS requirements, and how to prepare for surveys under the updated structure:

  • Survey Process Guides (SPGs)
    These new guides are now the official reference for both healthcare organizations and surveyors. They lay out the expected procedures during surveys and are designed to closely mirror CMS’s approach—making the process more predictable and better aligned with federal oversight.

  • Disposition Reports
    Wondering what happened to a specific Element of Performance (EP)? These reports show exactly where each former requirement ended up—whether it was relocated, combined with others, renamed, or removed. They include notes describing the nature of each change so nothing gets lost in translation.

  • Crosswalk Compare Reports
    These detailed documents offer a side-by-side comparison of three things: the original Joint Commission EPs, the revised EPs under the new structure, and the applicable CMS Condition of Participation. This is especially useful for policy and compliance teams updating internal documentation or preparing for survey readiness.

These resources are designed not just for information—but for action. They give facilities a roadmap to adjust internal policies, identify gaps, and ensure alignment across both Joint Commission and CMS standards.

What It Means for Your Organization

While the simplified structure is a welcomed change, healthcare organizations should not assume this means less work. Instead:

  • Most existing requirements remain but are now reorganized under the new chapter.

  • Facilities must review and revise internal policies, training materials, and documentation to align with the PE format.

  • A focus on outcome-based measures and a data-driven survey process is central to the new accreditation model.

Timeline to Watch

  • Changes go into effect: January 1, 2026

  • Six-month notice for any further revisions before implementation

  • Prepublication standards, crosswalks, and resources are available now for proactive planning

Final Thoughts

The consolidation of Life Safety (LS) and Environment of Care (EC) standards into the new Physical Environment  (PE) chapter reflects a bold step forward by The Joint Commission. This change aligns accreditation with CMS regulations, reduces redundancy, and places greater focus on performance, clarity, and outcomes.

Although many familiar requirements remain, their organization and presentation have changed—requiring facilities to reassess and realign their documentation, training, and compliance strategies.

At Compass CG, we’re here to help organizations across both the public and private sectors prepare confidently for this shift. We understand the nuanced challenges that come with navigating compliance under the NFPA 101–2012 edition used by CMS-accredited and Joint Commission–surveyed facilities, as well as the evolving demands of the 2024 edition increasingly adopted by public sector clients.

Whether your facility needs support reviewing existing life safety drawings, updating documentation to reflect the new EP framework, preparing for the next PE assessment, or aligning policies with the correct Joint Commission standard, corresponding EP, or applicable NFPA edition—our team provides practical, tailored solutions that align with your operational needs.

Facilities that act now will be better prepared—and better protected—when the new PE chapter takes effect on January 1, 2026.

Click here to read the official Joint Commission release

The Hidden Value of Systems Manuals in Healthcare Commissioning

When a healthcare construction project wraps up—whether it’s a new hospital wing, an outpatient clinic, or a specialty care expansion—leaders often ask: Are we ready for occupancy? Are systems functional? Do we have all the required documentation?

But a deeper, often-overlooked question is just as important: Do our facility teams have what they need to operate and maintain everything that was just built—starting on day one?

This is where the Systems Manual becomes essential—not just as a closeout deliverable, but as a long-term tool for operational readiness, performance assurance, and continuous improvement.

Why the Systems Manual Matters

In many projects, commissioning is introduced late—sometimes even as an afterthought. Budget constraints or compressed timelines often force teams to cut commissioning involvement early in design, assuming they can make up ground during construction.

It’s a common tradeoff—but one that shows its consequences at turnover.

The Systems Manual is more than just a binder of closeout documents. It is the organized, centralized collection of information that supports ongoing operation, maintenance, and optimization of building systems across the facility’s lifecycle. It’s a tool for both onboarding and legacy knowledge—a resource that helps teams operate buildings safely, reliably, and efficiently.

What a Complete Systems Manual Should Include

A well-organized Systems Manual includes six main sections, each serving a different but vital purpose:

Part 1: Executive Summary - Provides an overview of the building’s design, construction, and operational requirements.

Part 2: Facility Design and Construction - Includes the Owner’s Project Requirements (OPR), Basis of Design (BoD), construction drawings, and specifications.

Part 3: Building Systems and Assemblies Information - Captures final product submittals, O&M data, warranties, and system-specific documentation.

Part 4: Facility Operations - Outlines operating procedures, system sequences, set points, maintenance plans, and emergency protocols.

Part 5: Training - Documents training sessions, materials, and the procedures for updating the Systems Manual over time.

Part 6: Commissioning Project Reports - Contains test reports, Cx Plans, issues logs, resolution plans, and verification documentation.

Structure with Purpose: System-Based Organization

The Systems Manual should be thoughtfully arranged to match how facility staff interact with the building.

Specifically: Where practical, organize the Systems Manual by system—not by discipline. This system-based structure—grouping content by HVAC, electrical, plumbing, etc.—aligns with how operations teams use and manage building systems. It ensures that documentation is accessible, intuitive, and relevant to the daily needs of O&M personnel.

This recommendation should be established during the development of the OPR and maintained throughout the design and construction process. System-focused organization reduces confusion, supports cross-training, and promotes clarity during troubleshooting, modifications, and ongoing commissioning.

Best Practices for Systems Manual Development

To ensure that your Systems Manual becomes a useful, living document—not just a closeout requirement—follow these principles:

  • Start early. Define the Systems Manual structure in the pre-design phase.
  • Capture content continuously. Don’t wait until project turnover to collect documents.
  • Think like the end user. Organize information in a way that supports daily operations.
  • Include editable formats. PDFs are helpful, but editable logs and schedules empower teams to maintain the manual over time.
  • Plan for evolution. A good manual supports modifications, performance tracking, and long-term optimization—especially in facilities pursuing Ongoing Commissioning (OCx).

Conclusion

The Systems Manual is often treated as a closeout formality—but it’s far more than that. When properly structured and thoughtfully assembled, it becomes one of the most powerful tools your facility engineering staff has to ensure a smooth transition, safe operation, and long-term building performance. In healthcare environments, where reliability is critical and downtime is not an option, a well-organized Systems Manual is not a luxury—it’s a necessity.

Whether you’re a commissioning agent, a design consultant, or a facility leader, the quality of your Systems Manual reflects the integrity of the entire project delivery process.

Performance-Based Option

In modern building design—particularly for complex, high-rise, or unique architectural structures—prescriptive code requirements may not always provide sufficient flexibility to achieve both compliance and optimal functionality. NFPA 101 (2012), Life Safety Code, Chapter 5 introduces the Performance-Based Option as a recognized and structured alternative to traditional prescriptive approaches. This method allows designers and Authorities Having Jurisdiction (AHJs) to work collaboratively to achieve code compliance while accommodating innovative designs or challenging conditions.

What Is the Performance-Based Option?

Outlined in Chapter 5 of NFPA 101 (2012), the Performance-Based Option provides a formal methodology for demonstrating compliance with the Code’s fire and life safety goals through engineering analysis, scenario development, and quantitative assessment. Rather than following prescribed formulas or fixed requirements, this approach allows the design team to validate that the building will perform acceptably under a range of realistic fire and egress conditions.

Core Process and Methodology

The process begins with a clear definition of:

  • Establishing Fire Safety Goals and Objectives (Sections 4.1 and 4.2)
  • Defining Performance Criteria and acceptance thresholds (Section 5.2)
  • Developing Fire Scenarios and Assumptions (Section 5.6)
  • Conducting Safety Factor Analysis and Verification Methods (Section 5.7)
  • Documenting Design Evaluations and outcomes (Section 5.8)

Figure A.5.1.1 – Performance-Based Design Process Flowchart Figure A.5.1.1 illustrates the structured logic that governs a performance-based life safety design under NFPA 101. Rather than applying rules rigidly, this diagram maps the step-by-step thought process an engineer follows: defining safety goals, selecting relevant fire scenarios, determining assumptions, and using modeling tools to analyze outcomes. At each stage, the intent is to ensure that performance—not mere compliance—guides decisions. The flowchart’s cyclical path reflects that design is iterative; if criteria are not met, assumptions or strategies must be reevaluated until a defensible and code-acceptable solution is achieved.

Exhibit 5.2 – Input and Output Relationships in Performance-Based Design Exhibit 5.2 focuses on the relationship between the core inputs, such as occupant characteristics, building systems, and fire dynamics, and how these are transformed through analytical models into actionable outputs. The figure underscores that performance-based design is not an abstract exercise but a data-driven methodology. Inputs feed into modeling tools—be it fire simulation, egress modeling, or risk analysis—and the resulting performance data are used to determine if the design meets or exceeds life safety objectives. It conveys the importance of treating performance as a measurable outcome derived from well-defined parameters.

Where Is It Used?

Performance-based design is particularly valuable in:

  • Healthcare facilities with operational constraints that require non-standard evacuation strategies
  • Historic structures where preserving architectural integrity limits prescriptive modifications
  • High-rise or mixed-use buildings with complex fire protection needs
  • Assembly occupancies or venues with large, diverse occupant loads

The flexibility of this method enables designs that are safe, efficient, and often more cost-effective—especially when prescriptive codes would require excessive retrofits or design changes.

Professional Oversight and Responsibilities

Using the Performance-Based Option demands expertise. NFPA 101 requires the process be conducted by qualified fire protection engineers (Section 5.1.3). Additional provisions include:

  • Documentation and transparency of all assumptions, inputs, and outputs (Section 5.8)
  • Verification methods that reflect real-world reliability of systems and behavior
  • Ongoing oversight to ensure that as the building is altered over time, its performance remains compliant (Section 5.1.7)

Local Authorities Having Jurisdiction (AHJs) retain final review and approval authority and may require independent peer review to validate the approach (Section 5.1.4).

Benefits and Challenges

Benefits:

  • Design flexibility
  • Innovation in life safety solutions
  • Custom responses to unique risks
  • Often more efficient use of space and resources

Challenges:

  • Requires specialized expertise
  • May involve greater upfront design effort and documentation
  • Approval is dependent on AHJ cooperation and confidence in the approach

Conclusion

The Performance-Based Option within NFPA 101 (2012) represents a mature, structured, and technically sound path to compliance—empowering engineers and designers to meet the Code’s life safety goals while enabling innovation and flexibility. When used properly, it ensures that safety is maintained not just by meeting rules, but by truly understanding and managing risk.

The Case for Continuous Commissioning

As buildings continue to evolve into complex, technology-driven systems, the role of facility commissioning has shifted from a “nice to have” to a mission-critical component of operations. Whether it's retro-commissioning (RCx) or monitoring-based commissioning (MBCx), these practices are rapidly becoming essential tools in the facility manager's toolbox.

The Hidden Costs of Complexity

Today’s smart buildings are designed for performance, comfort, and energy efficiency. But with that added sophistication comes a higher risk of operational drift. More systems mean more potential points of failure—from a stuck damper to a slow, unseen rise in energy consumption. If left unchecked, these issues can result in wasted resources, costly repairs, and dissatisfied occupants.

Fortunately, the same digital advancements that introduced these challenges have also enabled smarter solutions. Modern buildings equipped with intelligent sensors, IoT devices, and energy management platforms now offer powerful diagnostic capabilities. These systems can detect anomalies early, allowing facility managers to take corrective action before minor issues escalate.

Retro-Commissioning: Bringing Systems Back to Spec

Retro-commissioning focuses on evaluating and fine-tuning existing systems that have deviated from optimal performance. According to industry experts, RCx offers benefits far beyond standard preventive maintenance. By optimizing sequences of operation, calibrating controls, and improving airflow and humidity control, facilities can experience:

  • Enhanced system reliability and longevity

  • Lower energy and operating costs

  • Improved occupant comfort

  • Better indoor air quality and ventilation

  • Comprehensive, updated documentation for future maintenance

Additionally, many facilities see operational savings in the range of 25% to 40%, depending on the baseline conditions and implementation strategy.

Monitoring-Based Commissioning: Ongoing Optimization

While RCx provides a valuable snapshot in time, monitoring-based commissioning is an ongoing process. It leverages continuous data collection through sensors, meters, and trending tools to verify and sustain the results of RCx measures.

This strategy allows facility teams and commissioning agents to:

  • Validate utility savings over time

  • Track system performance through remote access

  • Maintain a living database of findings and improvement opportunities

  • Identify future capital needs before they become critical issues

With a typical 12-month monitoring period, MBCx acts as a safeguard—ensuring implemented energy conservation measures (ECMs) are delivering the intended results.

The Role of IoT in Facility Commissioning

The proliferation of Internet of Things (IoT) devices has been a game-changer for commissioning. Wireless and wired sensors now collect real-time data on building pressure, temperature, humidity, and equipment performance. This transparency not only empowers facility managers with actionable insights but also enables collaboration with commissioning agents, even remotely.

When used effectively, these tools transform commissioning from a periodic event into a continuous improvement strategy—making building performance more predictable, sustainable, and efficient.

Final Thoughts

Facility commissioning is no longer just a compliance measure or energy-saving tactic. It's a core strategy for ensuring long-term operational excellence in modern buildings. Whether you're retrofitting an aging facility or monitoring a high-performance one, commissioning delivers measurable value across energy, comfort, and cost.

As technology continues to advance, the question isn't whether to commission your facility—it’s how soon you can start.

Installation, Testing and Commissioning

Why Commissioning Should Start Early—and Stay Centered

In the world of building projects, one of the most overlooked truths is that systems don’t always perform the way they’re supposed to—at least not without some intentional coordination and accountability. Even with talented teams and solid designs, things can still go sideways. That’s where commissioning earns its value.

At its core, commissioning is about delivering on the promises made at the start of a project. It’s not just a checklist at the end—it’s a process woven throughout planning, design, construction, and turnover. When done right, it ensures that building systems are designed, installed, tested, and handed over in alignment with the Owner’s Project Requirements (OPR).

More Than a Quality Control Measure

Commissioning isn’t about adding red tape—it’s about preventing costly surprises. It's about making sure the systems perform as intended, not just on paper. Whether it's HVAC, lighting, or control systems, commissioning helps uncover gaps early and keeps everyone focused on the same goals throughout the project.

What’s often missed is the strategic advantage of starting the commissioning process early. Waiting until the project is halfway through construction—or worse, at the very end—shifts it into reactive mode. At that point, it’s damage control. Starting early means performance is built into the project, not tacked on at the end.

Value That Speaks for Itself

From an owner’s perspective, the ROI is clear: better system performance, fewer warranty issues, reduced downtime, and a smoother turnover. There’s real data showing commissioning leads to significant energy savings—upwards of 13–16% in some cases—with a solid return on investment.

But the benefits aren’t just financial. For designers and contractors, it means fewer RFIs and change orders. For operators, it means better documentation, more effective training, and systems that are easier to maintain from day one.

The Right Commissioning Provider Makes a Difference

One thing that can’t be overstated is the importance of having a qualified, independent commissioning provider (CxP). This person or team isn’t there to police the project—they’re there to advocate for the owner, facilitate collaboration across teams, and ensure performance stays at the center of every decision.

The best CxPs understand the systems, speak the language of both designers and contractors, and know how to keep projects on track without stepping on toes. Independence is key here—having no conflicting roles or financial interest keeps the focus where it belongs: on the building and its long-term performance.

Commissioning Is a Mindset

Ultimately, commissioning isn’t just a process—it’s a mindset. It’s about owning the responsibility to ensure buildings aren’t just completed, but completed right. And that doesn’t happen by accident. It takes deliberate effort, clear communication, and the discipline to align expectations from day one.

As projects get more complex and system integration becomes more critical, commissioning isn’t a nice-to-have—it’s essential. It’s one of the few tools we have that reliably bridges the gap between intent and reality.